Machine Retrofit & Upgrade Service
Confirm with salesSICK Machine Safety Sensor & Light Curtain Retrofit
Review the exact configuration, utilities, included equipment, options, delivery, installation, training, warranty, service, and parts pathway for this machine.
Final equipment, accessories, freight, taxes and field-service scope are confirmed in the written quote.
Material, geometry, capacity, production volume, quality, and workflow.
Model, controller, source or drive, tooling, included equipment, and options.
Power, air, gas, extraction, cooling, access, unloading, and placement.
Delivery, startup, training, warranty, service, parts, and acceptance.
Buyer fit
Match the machine to the real work
The best configuration depends on the actual parts, production target, available utilities, operator workflow, and complete delivered project.
Prepare these application details
- Material type, grade, thickness or capacity, dimensions, geometry, and drawings.
- Prototype, mixed job-shop, repeat production, automation, and throughput expectations.
- Required finish, accuracy, repeatability, tooling, consumables, and downstream work.
- Current voltage, phase, amperage, compressed air, process gas, extraction, and floor space.
Industrial component ecosystem
Component brands used in our machine builds
We build around established industrial component families selected for the machine power, duty cycle, application, serviceability, and approved production configuration.
Brand and model can vary by power level, availability, controller package, and final engineering review. The exact installed components are confirmed by model and part number in the written quotation before order.
Configuration control
Lock the exact build before ordering
We turn the selected machine family into a written component schedule tied to the final power, controller, utilities, and production requirements.
-
01
Application matched Parts, materials, duty cycle, utilities, and workflow reviewed.
-
02
Components selected Source, head or controller, drives, cooling, electrical, and options aligned.
-
03
Build sheet confirmed Exact brands, models, part numbers, included equipment, and exclusions recorded in the quotation.
Machine specifications
Technical and facility planning
Review the selected machine build, utilities, included equipment, and site requirements together before ordering.
- Model
- UM-COMP-SICK-018
- Machine family
- Machine Retrofit & Upgrade Service
- Working area / capacity
- To be completed
- Power / tonnage
- To be completed
- Controller and axes
- To be completed
- Electrical requirements
- To be completed after exact-build review
- Machine dimensions
- To be completed
- Machine weight
- To be completed
- Lead time
- Confirm with sales
Included equipment
The written quote will identify the machine, controller, source or drive system, cooling, accessories, starter items, and other included equipment.
Available options
Options are selected for automation, material handling, extraction, gas, tooling, safety, utilities, production volume, and future expansion.
Site readiness
Plan the facility before delivery
Electrical service, utilities, extraction, access, unloading, placement, commissioning, and operator preparation are part of the machine project.
- Confirm voltage, phase, amperage, breaker, disconnect, grounding, and transformer requirements.
- Confirm compressed air, process gas, extraction, cooling, drainage, and environmental requirements.
- Confirm crate dimensions, machine weight, door and aisle clearance, dock, forklift, crane, and placement path.
- Complete the site-readiness checklist before installation and training are scheduled.
Delivered project and ownership
Installation, training, warranty, service, and parts
The exact scope is confirmed in writing for the selected equipment, customer location, site readiness, and commercial agreement.
Installation and startup
Confirm unloading, placement, connections, startup, test work, acceptance, travel, exclusions, and customer responsibilities.
Operator training
Confirm audience, duration, controller and machine functions, safety boundaries, materials, applications, and follow-up needs.
Warranty
Confirm warranty term and start date, covered components, exclusions, consumables, labor, travel, shipping, diagnostics, and claim process.
Service and parts
Confirm remote diagnostics, on-site service, parts identification, consumables, escalation, scheduling, pricing, and geographic availability.
Frequently asked questions
Questions to resolve before ordering
How do I confirm this machine is suitable for my parts?
Send the material, maximum thickness or capacity, part dimensions, drawings, production volume, quality requirements, and sample expectations with the quote request.
What electrical and utility information is required?
Provide voltage, phase, available amperage, panel information, compressed air, process gas, extraction, cooling, floor space, and access details.
What is included with the machine?
The written quotation separates included equipment, starter consumables, optional equipment, freight, installation, training, and customer-provided items.
How are delivery, installation, and training handled?
The project plan confirms delivery ZIP, unloading method, rigging and placement, site readiness, startup, test work, operator training, travel, and acceptance.
What warranty and service support applies?
The applicable written warranty and service scope identify the term, start date, components, exclusions, parts process, labor, travel, shipping, diagnostics, and escalation path.
Complete machine information Description
This is an independent retrofit and upgrade service covering the SICK safety and guarding package on a production machine. No scope is written before a compatibility assessment of your exact machine, control, wiring and mechanical condition. Final scope, parts, timing and price are confirmed after the assessment; repair, replacement or upgrade is recommended only once the unit has been evaluated.
Possible upgrade scope
- Existing safety-device and hazard-area assessment
- Light curtain, scanner, switch or sensor replacement
- Safety relay, PLC and emergency-stop integration
- Mounting, alignment, muting and reset-circuit setup
- Functional testing and documented observations
Who this fits
- Machines whose guarding no longer matches how the job is actually run
- Owners preparing for an audit or a change of ownership
- Plants integrating legacy devices into a modern safety circuit
- Shops that need stop-time measurement behind their guard distances
What the compatibility assessment covers
| Item | What is checked | Why it decides the scope |
|---|---|---|
| Risk assessment | Existing assessment, hazard list and required performance level | The assessment decides the device class — everything else follows it |
| Existing safety devices | Brand, model, age and validity of the current devices | Some legacy devices cannot be integrated into a modern safety circuit |
| Control interface | Safety relay or safety PLC, stop category and response time | Stop time measurement decides mounting distance, which decides layout |
| Machine stopping performance | Measured stop time and overrun | Guard distance is calculated from measured stop time, not from a catalog |
| Access and workflow | Load, unload, tooling change and maintenance access | Guarding that blocks the workflow gets defeated within a month |
Configuration and component options
Each major assembly on a production machine is selected at configuration. The shortlist below is what the build is drawn from.
| Assembly | Options | How it is selected |
|---|---|---|
| Safety light curtain and interlock options | SICK | Confirmed from the installed unit |
| Laser safety window and enclosure options | LaserVision / Kentek-class certified materials | Rated to the delivered wavelength and power |
| PLC and HMI options | Siemens / Schneider Electric / Delta / Omron | Configured at build |
| Electrical and panel component options | Schneider Electric / Siemens / Omron / Delta | Panel standard by build |
Component brands are configuration-dependent and are confirmed in the written quotation. UmproTech is an independent supplier and service provider and is not affiliated with, sponsored by or endorsed by any equipment or component manufacturer named on this page. Brand names identify equipment and components only.
Compatibility data required
The scope is written from these, not from the machine name:
- Machine make, model, year and serial number
- Photos of the machine from every access side, and of the current guarding
- Current safety device brand and model
- Your existing risk assessment if you have one
- How the operator loads, unloads and changes tooling
- Delivery ZIP code and site access for a service visit
Limits stated before the work starts
- Final compliance on your floor remains the machine owner's responsibility
- Stop-time measurement is part of the job — distances cannot be assumed
- Guarding that is not designed around the real workflow will be bypassed
Scope and price
The schedule follows parts, not the order date: lead time and shutdown window appear as two separate lines on the quotation. Final configuration, compatibility, and availability are confirmed in the written quotation.
Request a service assessment
With that information the quotation covers configuration, freight and installation scope in one written response. Request a service assessment.
Request a complete machine quote
Bring the application, facility, timeline, and project scope into one request
Include drawings, materials, maximum thickness or capacity, production volume, utilities, ZIP code, unloading, installation, training, financing, and timing.